Mission Hills

This complete home remodel added two and half bath and a brand new, custom built, 600 sq ft master suite. The challenging aspect of this project was the entire home was reconfigured to meet the clients desires. This included moving all walls in the house and a redesigned floor plan. Outside was beautified with a 500 sq foot Lani Patio and 800 sq foot raised deck build.  Coastline Construction worked with Curtiss Energy Group to provide solar panels as a finishing, energy saving touch. The entire project took 5 months to complete with a $390k investment. HYR Building LLC and Derrick White of Coastline Construction designed the entire project.